Friday 1 November 2013

Assignment 2: Change in requirements

In the interest of your interests...  I have decided that you are no longer required to submit material in relation to items 18 and 19 of the DA submission checklist (these are non-core items). This means you do NOT need to produce a Concept Drainage Plan or a Site Waste Minimisation and Management Plan.

You do still need to produce material in relation to checklist items 1-9, 12-13, 15

3 comments:

  1. Here is the link to the Sketchup file of the Mosman site:

    https://www.dropbox.com/s/u0gbpan6opxfctl/Arch_1390_site.skp

    ReplyDelete
  2. Are the results for assignment 1 available for pickup yet?

    ReplyDelete
    Replies
    1. Yes, my apologies for the delay. Marks have already gone out. I have just resent yours in case there was a further problem with distribution.

      Delete